Details:
HBS were appointed as the Project Manager and for the M&E detailed design of the phased refurbishment of the existing M&E installations within 9000 m2 of tenanted offices distributed over 8 floors and included the complete replacement of all central plant including Boilers, Air Handling Units, CWS tanks, CWS booster set etc. together with the formation of additional vertical mechanical services risers, new main electrical switchroom, landlords electrical services infrastructure, new fire alarm installation, common area lighting, toilet area refurbishment and formation of additional disabled WC facilities.
Each office floor is currently being refurbished on a floor by floor basis including new perimeter four pipe fan coil units, mechanical ventilation, lighting and power installations. |